Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023

All discussion related to transportation to, from and within the Sierra Nevada. Need directions or flight information? Info on road conditions? A ride to the trail head? Can you offer a ride, or do you run a transportation business or shuttle service for the Sierra Nevada? Come on in and post the details!
User avatar
JosiahSpurr
Topix Regular
Posts: 157
Joined: Mon Jul 26, 2010 4:39 pm
Experience: Level 4 Explorer
Location: Topanga, CA
Contact:

Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023

Post by JosiahSpurr »

Great, thanks. Note that the PROJECT UPDATE above (Jan. 26) does not include the boulder slide (4 of 5) and the larger mudslide (5 of 5) mentioned in my May 25 post above.
User avatar
commonloon
Topix Regular
Posts: 327
Joined: Wed Aug 07, 2013 3:32 pm
Experience: Level 4 Explorer

Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023

Post by commonloon »

SEKI posted to their facebook page (just noticed):

"Highway 180 to Cedar Grove and Roads End: Highway 180 was severely damaged and closed throughout all of 2023. Caltrans is continuing repairs outside the park, west of Cedar Grove. Current projections are for repairs to be completed sometime in June. We hope to reopen Cedar Grove to the public shortly after Caltrans repairs are complete."

This sounds hopeful for a July opening of Cedar Grove, etc.
User avatar
mkbgdns
Topix Regular
Posts: 111
Joined: Thu Aug 06, 2009 11:43 am
Experience: N/A

Re: Highway 180 Expected, and Possibly Mineral King Road, to Remain Closed in 2023

Post by mkbgdns »

your hopefulness should include a plan B.
User avatar
maverick
Forums Moderator
Forums Moderator
Posts: 11841
Joined: Thu Apr 06, 2006 5:54 pm
Experience: Level 4 Explorer

Reds Meadow Road Construction Update

Post by maverick »

SEKI NP:

Tentatively beginning April 15 through about May 10 significant weekday, daytime closures will go into effect between Hospital Rock and the Giant Forest Museum. See image for the detailed schedule during this period. During the second 4-week phase, tentatively scheduled from May 13 to June 7, weekday, daytime delays should only be about 30 minutes.

Access from Grant Grove in Kings Canyon to the Giant Forest area in Sequoia will be open to visit the General Sherman Tree, Lodgepole, Moro Rock, and more when closures are in effect.

Similar road construction will be taking place along the Mineral King Road, but a start date or schedule have not been set. Current estimate is for work to begin in late April and take about 8 weeks to complete. Road closures with scheduled pass throughs for residents will be in effect until the Memorial Day weekend, when access typically reopens for the season to public vehicles. After the Memorial Day weekend, delays should only be about 30 minutes through project completion.

Road construction by Caltrans outside the park on Highway 180 to Cedar Grove is still projected to be completed sometime in June. We hope to reopen Cedar Grove to the public shortly after Caltrans repairs are complete.

Crystal Cave Road will remain closed for repairs and recovery in 2024.

Schedules are subject to change, and we urge anyone planning to visit during this time to check our park website for the most current information: https://www.nps.gov/seki/planyourvisit/ ... uction.htm
You do not have the required permissions to view the files attached to this post.
Professional Sierra Landscape Photographer

I don't give out specific route information, my belief is that it takes away from the whole adventure spirit of a trip, if you need every inch planned out, you'll have to get that from someone else.

Have a safer backcountry experience by using the HST ReConn Form 2.0, named after Larry Conn, a HST member: http://reconn.org